66 km Conveyor belt system at Brenner Base Tunnel
Standort

CONVEYOR BELT SYSTEM for the Brenner Base Tunnel

  • Design and engineering start: 2017
  • First delivery to job-site: March 2018
  • Last delivery to job-site: 2020
  • Average use of conveyor system: 5 years

Client

Brennero Tunnel Construction S.c.a r.l.


Created

2018 – 2020

Impressions

Data protection notice

This website uses third-party web analysis tools to analyze the use of the website and measure the success of advertising campaigns, as well as external components such as Google Maps. Cookies are stored for this purpose. The necessary cookies do not lead to any data transmission and cannot be deselected.