66 km Conveyor belt system at Brenner Base Tunnel
Standort

CONVEYOR BELT SYSTEM for the Brenner Base Tunnel

  • Design and engineering start: 2017
  • First delivery to job-site: March 2018
  • Last delivery to job-site: 2020
  • Average use of conveyor system: 5 years

Client

Brennero Tunnel Construction S.c.a r.l.


Created

2018 – 2020