Hydro-power plant Limmern
Standort

Full-round tunnel  formwork Hydro-power plant Limmern

Full-round formworks are expensive to design and manufacture. The
geometry and ring connector must be precisely adapted to the deformations of the concreting stage, otherwise it is impossible to strip
the ormwork later on. With the full-round formwork of the new pumped storage power plant in Limmern, there was also the additional difficulty of gradients measuring up to 22 % and exceptionally tight spaces.

KLL section D34: HVAC / smoke ex­haust sys­tems and plumb­ing

Systems

  • Ventilation and air conditioning systems
  • Smoke extraction system
  • Plumbing facilities with pressure reducing stations

Components

  • 6 large fans
  • 2 special fans per smoke extraction station
  • several monoblocs
  • several kilometers of water and air lines
  • several pressure reducing stations with a design pressure of up to 160 bar

Client

Kraftwerke Linth-Limmern AG


Built

2012 – 2016

Impressions