Conveyor belt system for the Koralm tunnel

Construction, manufacture, transportation, assembly and commissioning of the entire conveyor belt system including electrical equipment and control system.

Client

ÖBB Infrastruktur AG


Main contractor

ARGE Koralmtunnel KAT2 (Strabag & Jäger Bau GmbH)


Built

2011 / 2012

Impressions

Further references

Data protection notice

This website uses third-party web analysis tools to analyze the use of the website and measure the success of advertising campaigns, as well as external components such as Google Maps. Cookies are stored for this purpose. The necessary cookies do not lead to any data transmission and cannot be deselected.