conveyor belt system for the Jinping-II Hydropower Station
Design, planning and performance of the entire conveyor belt system including conveyor tunnel, civil engineering works, electrical installation and visualised plant controls.
This website uses third-party web analysis tools to analyze the use
of the website and measure the success of advertising campaigns, as well
as external components such as Google Maps. Cookies are stored for this
purpose. The necessary cookies do not lead to any data transmission and
cannot be deselected. Permission to use analysis/marketing cookies and external components may involve the transfer of data to the USA.