Conveyor belt in­stal­la­tion in the Andes
Standort

CONVEYOR BELT SYSTEM for the  Alto Maipo hydro­elec­tric com­plex, Santiago de Chile

The “Alto Maipo Hydro Project” is one of the largest private construction projects in South America. Marti Technik AG was awarded the contract to build, deliver and put into operation the tunnel belt conveyors with dumpsite conveyor for the main tunnel of Alfalfal VA2 and Las Lajas L1, with a length of around 10 km each.

Client

Alto Maipo S.p.A.


Built

2015 / 2016

Impressions