Tunnel conveyor with two boosters for use in loose rock
Standort

CONVEYOR BELT SYSTEM for the Metrô São Paulo

Brazil is investing in the expansion of its infrastructure. One project involves the “Metrô São Paulo”, the city‘s underground rail network which opened in 1974. In 2002, Line 5 became the newest route to open. Until today though, this line is not connected to the rest of the network as the work began from the edge of the city. Since 2013, Section 7 has been under construction as a singletube tunnel with a diameter of 10.21 m through loose rock. The tunnel will be 5.7 km long. For the removal of excavated material we supplied a tunnel conveyor with two boosters, a 74 m long ascending conveyor and a 45 m long discharge conveyor.

Client

Consórcio Metropolitano 5


Created

2018 – 2020

Impressions

Data protection notice

This website uses third-party web analysis tools to analyze the use of the website and measure the success of advertising campaigns, as well as external components such as Google Maps. Cookies are stored for this purpose. The necessary cookies do not lead to any data transmission and cannot be deselected.
Permission to use analysis/marketing cookies and external components may involve the transfer of data to the USA.

You can revoke or adjust your selection at any time under data protection information.