Gravel plant Ochsenstäfeli
2009 - 2010
Client
Kraftwerke Linth-Limmern AG
Main contractor
ARGE Kraftwerk Limmern
Services provided by Marti Technik AG
Design, planning, execution and certification of the complete processing plant for tunnel excavation material.
Main plant components
  • Mobile pre-crushing mill
    • Wet classification and sand processing
    • Oversized grit and surplus return to secondary crusher
    • Closed water circuit with waste water treatment plant and sludge dewatering
    • Building insulation and heating for operation upto -20°C at 1 900 m above sea-level
    • Silo installation with automatic dose extraction unit

Marti Technik AG
Lochackerweg 2
CH-3302 Moosseedorf
Fon +41 31 858 33 88
Fax +41 31 858 33 89