Gotthard base tunnel (Sedrun)
2006 - 2008
Client
AlpTransit Gotthard AG
Main contractor
ARGE Transco Sedrun
Order value
CHF 4.3 Mio.
Services provided by Marti Technik AG
Planning, manufacturing, delivery, installation and commissioning of the entire formwork system:

4 Vault-bottom formworks
2 Transport carriages for vault-bottom formworks
4 Vault formworks
4 Sealing carriages
4 Combination carriages
2 Reinforcement carriages
1 Formwork emergency stop
1 Formwork exhaust air shaft
1 Collar formwork cross-cut
3 Cable-block formworks
3 Niche formworks