Tunnel du Fréjus (F)
2010 - 2011
Client
SFTRF Société Française du Tunnel Routier du Fréjus
Main contractor
GIE Galerie de Sécurité Tunnel Routier du Fréjus
Order value
CHF 2.9 Mio.
Services provided by Marti Technik AG
Design, planning and implementation of the entire conveyor belt system including electrical installation, visualisation plant control and supervision of the assembly.
Plant description
  • 1 Tunnel conveyor 6335 m
    • 1 Sub-conveyor 485 m
    • 1 Disposal stacker 30 m
    • 2 External conveyors for the gravel return feed total 620 m
    • Control system and electrical installations