Sparvotunnel (I)
2011 - 2012
Client
TOTO Costruzioni Generali S.p.A.
Order value
CHF 3.7 Mio.
Services provided by Marti Technik AG
Construction, manufacture, transportation of the entire conveyor belt system including electrical installations and control system.
Plant description
  • 1 Tunnel conveyor system (from Herrenknecht AG)
    • 5 External conveyors «Area Badia Nuova» (Lot A) 60 m / 1540 m / 10 m / 300 m / 7 m
    • 5 External conveyors «AD5» (Lot B) 8 m / 494 m / 7 m / ~545 m / 40 m
Marti Technik AG
Lochackerweg 2
CH-3302 Moosseedorf
Fon +41 31 858 33 88
Fax +41 31 858 33 89