West Drainage Tunnel (HK)
2009
Client
Government of Hong Kong
Main contractor
Dragages-Nishimatsu Joint Venture
Order value
CHF 7.7 Mio.
Services provided by Marti Technik AG
Design, planning and performance of entire conveying belt system including electrical installation and visualised plant controls.
Plant description
  • 1 Tunnel conveyor East 4015 m
    • 1 External conveyor East incl. disposal site 25 m
    • 1 Tunnel conveyor West 6400 m
    • 1 External conveyor West incl. temporary disposal site and loading of ships 300 m
    • Automation and electrical system
Marti Technik AG
Lochackerweg 2
CH-3302 Moosseedorf
Fon +41 31 858 33 88
Fax +41 31 858 33 89