Brenner Basistunnel Aica – Mules (I)
2008
Client
Brenner Basistunnel BBT SE
Main contractor
S.E.L.I. SPA, Rom
Order value
CHF 3.3 Mio.
Conveyor belt system
Design, planning and performance of the entire conveyor belt system including electrical installation and visualised plant controls.
Plant description
  • 1 Tunnel conveyor with belt storage 10400 m
    • 1 Intermediate conveyor 224 m
    • Automation and electrical system
Marti Technik AG
Lochackerweg 2
CH-3302 Moosseedorf
Fon +41 31 858 33 88
Fax +41 31 858 33 89