Koralmtunnel (A)
2011 - 2012
Client
ÖBB Infrastruktur AG
Main contractor
ARGE Koralmtunnel KAT2 (Strabag & Jäger Bau GmbH)
Order value
CHF 2.1 Mio.
Services provided by Marti Technik AG
Construction, manufacture, transportation, assembly and commissioning of the entire conveyor belt system including electrical equipment and control system.
Plant description
The conveyor belt system consits of:
  • 2 Vertical conveyors (Elevator 130, Elevator 230)
  • 2 Drift conveyors (Conveyor 150, Conveyor 250)
Marti Technik AG
Lochackerweg 2
CH-3302 Moosseedorf
Fon +41 31 858 33 88
Fax +41 31 858 33 89